• Unity Suite
  • Solutions
    Local SCADA, EMS & PPC

    Locally control and monitor your renewable assets in real time with Local SCADA, Local EMS, and Power Plant Controller (PPC) solutions.

    Central SCADA & EMS

    Central SCADA and Central EMS solutions to provide portfolio-level control and monitoring across assets.

    Asset Performance Management

    Optimize asset availability and yield at scale with sophisticated monitoring, analysis, and intuitive workflows.

    AI Insights

    Leverage AI-powered analysis and recommendations for solar, wind, storage, and hybrid assets.

    Field Service Management

    Optimize field service through work order management, personnel scheduling, inventory management and maintenance KPIs.

    Asset Oversight

    Portfolio-level view of assets to provide a comprehensive system of record and enable oversight of operations, service providers, and revenue.

    Invoice Management

    Centralized and automated management of invoices to enable cashflow management, streamlined reporting, and accurate financial management.

  • Resources
    Blog

    Read recent blog posts and thought leadership from our experts.

    Resource library

    Access our library of e-books, white papers, and product sheets from our experts.

    Customer stories

    Read success stories and testimonials from our customers.

  • About
    Meet our team

    Learn more about our vision and values and meet our executive leadership team.

    Careers

    Interested in joining our team? See open positions.

    Contact us

    Get in touch with the Power Factors team.

    Events

    Connect with us at industry events and join our upcoming webinars.

    Newsroom

    Check out Power Factors' latest news and press releases.

  • Get a demo

READY FOR EXPANDED NERC GADS REPORTING REQUIREMENTS FOR WIND AND SOLAR?

The Power Factors Drive platform helps you stay on top of mandatory reporting. Generate submissions for your NERC GADS quarterly reporting with just one click.
April 20, 2020
wind-turbines-YTQGZCV-scaled
In this article

READY FOR EXPANDED NERC GADS REPORTING REQUIREMENTS FOR WIND AND SOLAR?

by Power Factors

Starting this year, NERC requires GADS quarterly reports for wind plants 75MW and larger (with required solar reporting coming in 2022).  

To help you stay on top of expanded NERC reporting requirements, the Power Factors Drive platform generates GADS reports for your wind plants with just one click.

Screen-Shot-2020-04-20-at-9.00.57-AM
Generate a GADS report with just one click.

To ensure the reliability and security of the North American bulk power system (BPS), the North American Electric Reliability Corporation (NERC) has required conventional energy producers to submit Generating Availability Data System (GADS) reports for their 20MW+ systems since 1982.  

Starting in 2018, NERC expanded mandatory GADS reporting to include wind plants, requiring quarterly reports for plants with a Total Installed Capacity of 200MW or larger. 

In 2019, reports started to be required for wind plants with a Total Installed Capacity between 100 MW and 199.99 MW. Effective January 1, 2020, NERC mandatory GADS reporting expanded to cover all wind plants with a Total Installed Capacity of 75MW and larger.  

And solar plants aren’t far behind! NERC begins voluntary GADS reporting on solar plants in 2021, with required reporting coming in 2022. 

SEE HOW THE DRIVE PLATFORM MAKES GADS REPORTING QUICK AND EASY. 

Learn more on NERC’s website: 

Brief overview of NERC GADS reporting.  

GADS Wind Turbine Generation Data Reporting Instructions. 

Solar GADS reporting updates per NERC’s published meeting minutes. 

End-to-end solutions across the entire renewable asset lifecycle

We provide the world’s most comprehensive product suite — purpose-built for renewable energy assets.
How Software Helps North American Solar Owners Tackle New NERC GADS Reporting Requirements
May 21, 2024
How Software Helps North American Solar Owners Tackle New NERC GADS Reporting Requirements

NEW REPORTING REQUIREMENTS FOR SOLAR IN 2024  Starting this year, the North...

Have Solar Plants in North America? Here’s How Power Factors Helps You Navigate the New 2024 NERC GADS Reporting Requirements for Solar Sites
December 04, 2023
Have Solar Plants in North America? Here’s How Power Factors Helps You Navigate the New 2024 NERC GADS Reporting Requirements for Solar Sites

TheNorth American Electric Reliability Corporation (NERC)is a not-for-profit...

13 Things to Consider Before Building Your Own Renewable Energy Software
April 21, 2022
13 Things to Consider Before Building Your Own Renewable Energy Software

13 THINGS TO CONSIDER BEFORE BUILDING YOUR OWN RENEWABLE ENERGY SOFTWARE ...

Optimize assets, maximize revenue, and grow your portfolio with Unity

Ready to experience the future of renewable energy management?
Group 2277